CT Forwarding made history in the UAE. Break bulk shipment directly hauled from the sea by a floating crane, carrying 4 mega reacots of 35m long each and weighting 829 TONS total.
Jebel Ali port had to close the canal to ensure the safety of this operation.
The units were delivered door to door to Europe.
Facts about the project:
Industry: Break bulk & RORO
Shipment Type: Reactors
Shipment Size: 35m long / 800 tons total
Project Duration: 2 months